Small Cell Project
Project Services
Project Timeline
4 Months
Challenge
TEP partnered with a company that requested small cell antennas to be located near the landlord's business branding.
MLA Site Amendment Project
Challenge
TEP worked to rectify issues when a site was deemed structurally unsound.
Macrocell Floodplain Site
Project Services
Project Timeline
5 months
Challenge
A proposed Macrocell site was located within a floodway & floodplain. TEP's Site Acquisition and Regulatory Compliance teams worked together to decrease impacts of the proposed tower, to the floodplain.
BP and NTP for Major Network Upgrade Projects
Challenge
TEP was brought on as a project management resource to obtain permits and NTPs for major carrier upgrades with one of the largest wireless providers in the country. Thousands of upgrades were in the queue for completion, but poor management of permitting had the overall project in a standstill.
Non-MLA Site Amendment Project
Project Services
Project Management
Civil Engineering
Structural Engineering
Zoning & Permitting
Modification Installation
Project Timeline
8 Months
Challenge
TEP partnered with a major U.S. carrier on a Non-MLA Site Amendment project requiring Site Acquisition services across 25 sites in the Carolinas.
Glenwood 2 PCS and 850 RET Upgrade
Project Services
Project Timeline
2 months after award, 5 days after installation
Challenge
Upgrade existing rooftop site by adding PCS and 850 RET to three sectors.
New Site Build & Mod Construction Management
Project Services
Project Timeline
Start work (3) weeks after each site NTP is received, construction completed within 50 days of start date
Challenge
Manage installation of new and replacement ground equipment, tower mounts, transmission lines, and antennas on (5) sites.
Guacamaya Cary, NC Cell Tower
Project Services
Project Timeline
2 Months
Challenge
TEP worked efficiently with Guacamaya and the general contractor to expedite the opening of the restaurant while keeping the project both code compliant and customer friendly.
Access Road Relocation
Project Services
Project Timeline
One Year
Challenge
The Access Road Relocation project needed to be re-routed to enter the existing compound from the opposite direction. TEP engineers used Civil 3D to design a road within the requirements of the county.
Barnesville
Challenge
TEP was tasked to determine the steel reinforcement in an existing foundation to avoid costly foundation modifications.
Zanesville
Challenge
TEP worked with Duke Energy to develop a bolted reinforcement solution to save resources and bring the structure into compliance.
Bowen Park
Challenge
TEP was tasked with determining the depth of a drilled shaft foundation that was installed in sandstone.
American Tower Q4 Southeast Maintenance
Challenge
Perform TIA maintenance repairs on 88 sites in the Southeast region.
Ashton Tower and Foundation Modifications
Project Services
Project Timeline
3 Months
Challenge
Perform modifications to both the tower and foundation of an existing 300ft guyed tower to support LTE technology upgrade. The modifications involved aerial welding and caisson foundation drilling.
Markland New Site Build
Challenge
New site build for 195 ft monopole to provide current and future carrier colocations.
Midvale Hill
Client
Project Services
Project Timeline
12 Weeks
Challenge
TEP Environmental was brought on to facilitate environmental regulatory compliance for a proposed tower project with a difficult project location. A sensitive historical viewshed, RF-limiting topography, existing land uses, and restrictive private property boundaries were all contributing factors to the site’s challenges.
American Tower As-Built
Challenge
Provide ATC with as-built surveys of existing sites to better determine lease and easement issues.
Orange County, North Carolina
Challenge
TEP Environmental was contracted to provide environmental permitting for a proposed access road to an existing tower site. The new road was needed as an alternate route to access the existing tower site. The proposed road crossed an unmapped jurisdictional stream, a manmade pond, and had the potential to affect upstream wetlands.
LTE Overlay
Client
Project Services
Project Timeline
5 waves over 4 years
Challenge
TEP was responsible for turnkey services across multiple departments in order to prepare a nationwide network launch.
Beckley
Challenge
Conducted a cultural resources assessment in order to satisfy Section 106 of the National Historic Preservation Act for a rooftop collocation.
Grain Due Diligence
Client
Project Services
Project Timeline
2 Years
Challenge
TEP was tasked with visiting all 320 sites to be acquired by Grain Communications in a 3-month window and completing inspections, mappings, and structural analyses of each structure. This is how we went above and beyond.