Challenge
TEP was tasked with completing both tower and foundation installations for a new 195-ft monopole. An 8ftØ by 23-ft long drilled caisson foundation were installed with TEP coordinating all foundation inspections and concrete testing. After the concrete cured and testing confirmed the compressive strength, the five independent tower sections were stacked using a crane and the tower plumbed.
Result
TEP completed the monopole new tower build at this site within the specified time frame which allowed the client to continue with the new site build for installing shelters, ice bridges, and remaining ground and tower equipment.
Share
Project Services
Project Timeline
2 Months
Year of Completion
2015