TEP worked to rectify issues when a site was deemed structurally unsound.

Challenge

An important coverage site was deemed structurally unsound and required relocation. Our client needed assistance evaluating the existing tower equipment in order to create a cost-effective design that could be quickly implemented at the relocated site.

Result

 

Working with RF engineers, we were able to analyze the design proposal to identify existing equipment that was already leased, but not included in the new design. We then calculated the total proposed windsail to ensure the design would stay within existing lease rights, and highlighted potential redesigns to the RF equipment configuration that saved the client $223/month in rental increases.

Share
Project Services
Amendments
Project Management
Site Acquisition
Project Timeline
2 weeks
Year of Completion
2016