Utility Construction on a Federal-Aid Highway Corridor

Open utility trench at a roadway construction site with a water main and blue gate valves, plus conduit staged alongside, while a wheel loader works near buildings under construction.

Project Overview

TEP delivered a comprehensive underground utility construction program as a subcontractor under a 4+ year contract for an 8+ mile federal-aid highway widening corridor. Operating under a DOT unit-price Schedule of Values, TEP installed water, sanitary sewer, and storm drainage systems while coordinating with active roadway operations.

The Challenge

The highway widening project required extensive utility installations alongside roadway improvements under strict DOT specifications and weekly certified payroll reporting. The Prime General Contractor needed a specialized subcontractor to execute the 8+ mile utility package without disrupting concurrent roadway schedules or active traffic lanes.

The Solution

TEP executed a full-scope utility installation subcontract under unit-price terms, integrating trenchless technology and strict compliance administration:

  • Water Line Installation: Installed new 8″ and 12″ ductile iron water lines, valves, air release and blow-off assemblies, fire hydrants, and meter relocations.
  • Sanitary Sewer Installation: Installed 10″ sanitary gravity sewer lines, 4-foot-diameter utility manholes, and abandoned conflicting existing piping.
  • Storm Drainage Installation: Installed 15″ through 60″ reinforced concrete and corrugated steel storm drainage pipes, pipe culverts, end sections, masonry structures, and converted drop inlets into junction boxes with manholes.
  • Trenchless Utility Crossings: Utilized bore-and-jack methods to install 20″ and 24″ casing beneath the roadway in both soil and rock conditions, avoiding open-cut disruption to active traffic lanes.
  • Compliance & Administration: Administered monthly pay applications and weekly certified payrolls under the unit-price Schedule of Values across the multi-year term.

The Result

  • Corridor Uninterrupted: The entire water, sewer, and storm drainage utility package was successfully delivered without interfering with the primary roadway schedule.
  • Traffic Maintained via Trenchless Crossings: Bore-and-jack casing installations allowed complex utility crossings beneath the highway to proceed seamlessly without closing active travel lanes.
  • Flawless Compliance: Weekly certified payrolls and monthly pay applications were executed without exception throughout the 4+ year contract term.
  • Single Point of Accountability: Managing the entire multi-system underground utility package under one subcontract streamlined coordination for the Prime General Contractor.

TEP Services Provided

  • Construction: Utility installations (water, sanitary sewer, storm drainage), Trenchless bore and jack casing
  • Program and Construction Management: Budget and schedule management, Schedule of Values and pay application administration, Certified payroll compliance, Subcontractor coordination

Share

Project Services

Program & Construction Management: Budget and schedule management, Utility coordination, Quality control, Safety oversight
Construction: Utility installations

Project Timeline