Hyperscale Fiber Backbone Expansion (Carrier / Hyperscale Client)

Long row of large orange HDPE fiber optic conduit reels lined up in a gravel storage yard, with another reel in the foreground and utility trucks parked near a building in the background.

Project Overview

Delivered turnkey engineering, permitting, construction, splicing, and project management services for a major multi-market long-haul fiber program supporting high-capacity, hyperscale-related network demand. This included a flagship four-span, ~120-mile corridor in the Carolinas comprising approximately 626,000 feet of planned conduit path. The work combined route engineering and design, underground construction across three parallel conduit paths (ultra-long-haul, carrier business, and a dedicated hyperscale path with separate handholes), material logistics, and detailed close-out documentation under a heightened build specification.

The Challenge

Hyperscale-driven fiber routes carry a higher bar than standard network builds. The client required tighter construction standards, rigorous testing before and after cable placement, and precise, location-accurate records of everything installed. At the same time, work was released across 121 active project records spanning 61 sites on an as-needed basis, so the program had to flex up and down without missing commitments. Boring and crossings, permitting, traffic control, material availability, and coordination with existing plant added further risk to schedules, and final acceptance depended on complete and accurate engineering and as-built data.

The Solution

We provided a single integrated team covering engineering, construction, and project management, with in-house capacity to scale crews and design resources alongside the client’s release of work. A disciplined approach to quality, safety, and documentation was built into every phase. Our teams delivered:

  • Engineering & Design: Feasibility review, route selection, field surveys, permitting, and constructible work packages prepared in the client’s required formats.
  • Construction: Underground and aerial fiber placement, conduit and duct systems, directional and conventional boring, structures and markers, and full restoration of affected areas.
  • Quality Control: Conduit integrity verification ahead of cable placement, adherence to the program’s high-specification build requirements, and inspection throughout construction.
  • Material Logistics: Managed warehousing, receiving, and handling of fiber and materials to keep crews supplied and accountable.
  • Safety & Compliance: Dedicated safety oversight, traffic control, and work-zone protection in line with industry and regulatory requirements.
  • Close-Out Documentation: Accurate as-built drawings, GPS-referenced records, test results, and complete close-out packages supporting final acceptance.

The Result

The client gained a dependable partner able to deliver to a demanding specification while scaling with the pace of the program. Consistent quality controls, clear documentation, and responsive project management reduced rework and kept routes moving toward acceptance, supporting the client’s ability to bring high-capacity connectivity online for its most demanding customers.

Services Provided

  • Planning & Engineering: Feasibility studies, route selection, field surveys, OSP design, drafting, and permitting
  • Program & Construction Management: Schedule and budget management, material warehousing and logistics, quality control, safety oversight, inspections
  • Construction: Underground and aerial fiber construction, boring, conduit and structure installation, restoration
  • Close-Out: As-built drawings, GIS-ready data, testing, and close-out packages

Share

Project Services

Program & Construction Management: Budget and schedule management, Material procurement, Utility coordination, Quality control, Safety oversight
Design & Engineering: Design services, Fielding and Permitting
Planning & Due Diligence: Feasibility Analyses, Land Surveying
Construction: Fiber networks

Project Timeline