Turnkey Fleet EV Charging-as-a-Service for a Municipal Government
Project Overview
TEP delivered a turnkey fleet EV charging-as-a-service program for a municipal government in upstate New York, supporting roughly 200 vehicles across nine departments over a four-year phased schedule. Spanning nine delivery phases from assessment through operations, the program deployed Level 2 and DC Fast Charging infrastructure across city sites to advance climate goals.
The Challenge
The city needed to turn its fleet electrification plan into working infrastructure while navigating complex hurdles. Key challenges included managing diverse electrical capacities across sites, ensuring emergency vehicle resilience during outages, scaling capacity alongside yearly vehicle arrivals, meeting security standards, and providing a low-upfront-cost structure without fragmented vendor coordination.
The Solution
TEP acted as a single accountable provider for the full lifecycle of the charging program, partnered with a national EV charging solutions provider:
- Plan Review & Alignment: Evaluated the existing plan against vehicle charging capacities and the multi-year delivery schedule.
- Site Assessment & Engineering: Performed field assessments and produced permit-ready single-line diagrams, load calculations, and utility make-ready scopes.
- Resilient Architecture: Designed a mixed Level 2 and DCFC charging layout with operating plans to keep critical first-responder vehicles charged during outages.
- Procurement & Installation: Procured OCPP-compliant, secure hardware and executed electrical and civil construction, network configuration, and commissioning.
- Utility Coordination & O&M: Managed utility make-ready integration alongside long-term load management, network operations, and maintenance.
The Result
- Single-Provider Delivery Model: Delivered a comprehensive program covering assessment, engineering, procurement, installation, and long-term operations under one accountable partner.
- Phased Program Alignment: Successfully structured a phased rollout aligned with the four-year fleet electrification schedule.
- Resilient Charging Design: Combined Level 2 and DCFC charging to protect emergency-response readiness.
- Low-Upfront-Cost Structure: Established a service structure minimizing initial municipal outlays.
TEP Services Provided
- Design & Engineering: Site assessment, Engineering and design, Load calculations, Utility make-ready coordination
- Program and Construction Management: Procurement, Program management, Compliance and security verification, Commissioning, Operations & Maintenance (O&M)
- Construction: Electrical and civil construction, Charger installation, Site restoration
Share
Project Services
Project Timeline